top of page

A. Duie Pyle -Elkridge, MD
Geis extensively renovated this 60’ x 357’ terminal with new dock doors, siding, backup power generation, and drive-in access. After demolishing a portion of the building that was no longer serviceable, a 6,384 square foot office addition redeveloped over the existing footprint. A new truck maintenance garage complete with an automated truck washing system further enhanced the utility of this ten acre property
​
Project Details:
​
Location: Elkridge, MD
Project Type: Additions/Renovations
​
​
​





bottom of page