top of page
240413-Z9-9587H_edited.jpg
241020-M3-0408H.jpg

ADS

ADVANCED DRAINAGE SOLUTIONS, INC.

2024

COMPLETION

17.5

ACRES

107,580

TOTAL SQUARE FEET

Project Overview 

ADS will be the most advanced stormwater engineering center in the world. It will include a product development lab focused on the full range of a product’s life cycle including an area to prepare product samples for testing, a fabrication lab to develop prototype parts and test fixtures, a lab to analyze structural performance of prototypes under different conditions, a 3D-printing lab to rapidly develop and vet concepts, a hydraulics lab that supports ADS’ water treatment businesses including separation, traditional filtration and low impact development filtration, an advanced technology lab for manufacturing and engineering prototyping. - Heather Schreiber, Advanced Drainage Systems.

Inquire Today!

Type
Screenshot 2025-03-06 at 9.24.48 AM.png

Project Data 

241020-M3-0687H.jpg

Material

Metal Panel & Glazing

Screenshot 2025-03-06 at 9.24.25 AM.png

Building Height

41'-0"

241020-M3-0732H.jpg

Docks - Cranes

1 - 3

Screenshot 2025-03-06 at 9.25.13 AM.png

Occupancy

1,052

Project Photos

bottom of page